Cannon Bridge House, London. The site has been undergoing a programme of refurbishments on all three reception area escalators, unfortunately, a new step man was supplied without safety demarcations and the handover was in a few days time, this escalator was 175 steps in length, so around 3 times the normal size of a standard escalator so the pressure was on to fit this into an already tight schedule, but as always at ESD with these last minute jobs we managed to carry out the works and keep the client happy. The escalator was successfully handed over.